高端外围女接单平台_全国空降快餐官方客服电话_全国空降平台官方网站_全国高端品茶联系方式

The valve order for The Tabella Hydropower Station project in Pakistan has been delivered successfully
Release time: 2020/11/6

The valve order for The Tabella Hydropower Station project in Pakistan has been delivered successfully.

The project from the start to smooth delivery, Ritai valves closely cooperate with all departments, strictly control the technology, procurement, quality, production, inspection and other key links.Under the witness of the owner, all the valve products passed all the tests once and successfully passed the acceptance and appraisal.


Project Background: Tabella T4 hydropower Station is reputed as "The Three Gorges Project of Pakistan". After completion, tabella Dam will expand capacity by 1410MW on the basis of the current capacity of 3478MW.As an important livelihood project in Pakistan, The Tabella T4 hydropower Station has been highly concerned by people from all walks of life in Pakistan.



+86-21-59170106
qrCode
主站蜘蛛池模板: 武汉市| 博爱县| 泌阳县| 余庆县| 绥中县| 筠连县| 瑞金市| 扬州市| 赞皇县| 泾川县| 红安县| 阳东县| 云龙县| 辉南县| 铅山县| 湟源县| 榆中县| 积石山| 长顺县| 美姑县| 衡阳县| 苏尼特左旗| 乌苏市| 中牟县| 奈曼旗| 博客| 石狮市| 潼南县| 砀山县| 双牌县| 长沙县| 海原县| 眉山市| 石渠县| 武功县| 泸西县| 怀柔区| 翁源县| 阜新市| 长岛县| 沐川县|