高端外围女接单平台_全国空降快餐官方客服电话_全国空降平台官方网站_全国高端品茶联系方式

The valve order for The Tabella Hydropower Station project in Pakistan has been delivered successfully
Release time: 2020/11/6

The valve order for The Tabella Hydropower Station project in Pakistan has been delivered successfully.

The project from the start to smooth delivery, Ritai valves closely cooperate with all departments, strictly control the technology, procurement, quality, production, inspection and other key links.Under the witness of the owner, all the valve products passed all the tests once and successfully passed the acceptance and appraisal.


Project Background: Tabella T4 hydropower Station is reputed as "The Three Gorges Project of Pakistan". After completion, tabella Dam will expand capacity by 1410MW on the basis of the current capacity of 3478MW.As an important livelihood project in Pakistan, The Tabella T4 hydropower Station has been highly concerned by people from all walks of life in Pakistan.



+86-21-59170106
qrCode
主站蜘蛛池模板: 东莞市| 忻城县| 开原市| 连云港市| 即墨市| 深州市| 易门县| 恩平市| 威信县| 紫云| 称多县| 呼玛县| 杭锦旗| 玉溪市| 盐山县| 乐清市| 巴东县| 斗六市| 太原市| 保靖县| 金寨县| 新民市| 樟树市| 远安县| 台北市| 咸阳市| 孙吴县| 海淀区| 辰溪县| 武鸣县| 云安县| 珲春市| 玉林市| 芒康县| 高陵县| 门源| 巴林左旗| 内江市| 成武县| 信宜市| 兴义市|