高端外围女接单平台_全国空降快餐官方客服电话_全国空降平台官方网站_全国高端品茶联系方式

The valve order for The Tabella Hydropower Station project in Pakistan has been delivered successfully
Release time: 2020/11/6

The valve order for The Tabella Hydropower Station project in Pakistan has been delivered successfully.

The project from the start to smooth delivery, Ritai valves closely cooperate with all departments, strictly control the technology, procurement, quality, production, inspection and other key links.Under the witness of the owner, all the valve products passed all the tests once and successfully passed the acceptance and appraisal.


Project Background: Tabella T4 hydropower Station is reputed as "The Three Gorges Project of Pakistan". After completion, tabella Dam will expand capacity by 1410MW on the basis of the current capacity of 3478MW.As an important livelihood project in Pakistan, The Tabella T4 hydropower Station has been highly concerned by people from all walks of life in Pakistan.



+86-21-59170106
qrCode
主站蜘蛛池模板: 夏津县| 六安市| 临沧市| 台湾省| 内江市| 荃湾区| 昭通市| 平武县| 井研县| 漳州市| 东阳市| 察隅县| 天镇县| 华安县| 荥阳市| 博白县| 滕州市| 桓台县| 璧山县| 株洲县| 藁城市| 惠来县| 嫩江县| 紫云| 姜堰市| 通江县| 元阳县| 锦屏县| 昌平区| 宽甸| 龙胜| 屏山县| 乌拉特中旗| 高唐县| 利辛县| 靖远县| 平武县| 蒙阴县| 甘泉县| 威信县| 前郭尔|